TSC Tumpen

Project-related data

Country
Austria
Building / Object
Power Station
dibit-service
Tunnel Scanning Audit, Tunnel Scanning Inspection
Service detail
tunnel length: about 800 m
Customer / Builder / Operator
BeMo Tunneling GmbH
Execution period
03/2022

Project description

The approximately 800m long inner shell is to be recorded in true color by means of high-resolution tunnel scans. The purpose of the tunnel scan is to inspect the concrete surface for cracks and other damaged areas, so absolute positional accuracy plays only a diminished role.