Strenger Flirscher Tunnel

Project-related data

Country
Austria
Building / Object
Road Tunnel
dibit-service
Tunnel Scanning Modernization, Tunnel Scanning Rehabilitation
Service detail
tunnel length:
2 times 5,8 motorway tunnel (Strenger tunnel)
1,5 km motorway tunnel (Flirscher tunnel)
Customer / Builder / Operator
ASFINAG Bau Management GmbH
Execution period
06/2020 - 12/2020

Project description

The aim of this project was to create a digital, high-resolution 3D model of the tunnels, textured in true color, to be used as a basis for the upcoming tunnel inspection and planning of rehabilitation work. Along the S16 Arlberg expressway, a total of 13.1km of tunnels were recorded at 80km/h using the Dibit high-speed system FSC6100-SRmF10.

In the course of the evaluations, the measurement data from the laser scanner and the high-performance cameras were combined and processed in the Dibit8 software to create a high-resolution, true-color 3D model of the entire tunnel surface including the carriageway (360°). The 3D model was located in the project coordinate system with reference to stationing and tunnel meters.