Logo: Dibit Messtechnik GmbH

 
 

Limberg 3

Project-related data

Country
Austria
Building / Object
Power Station
dibit-service
Tunnel Scanning As-Built
Service detail
tunnel length: about 5 km
Customer / Builder / Operator
VERBUND Hydro Power GmbH
Execution period
03/2022

Project description

The existing access and transport tunnel Lärchenwand/Schrahnbachtunnel, which leads to the powerhouse Limberg III, is to be scanned. Most of the tunnel is shotcrete surface. The scan will serve as the basis to perform a clearance and transportation analysis to ensure that large components will fit through the tunnel.