The existing access and transport tunnel Lärchenwand/Schrahnbachtunnel, which leads to the powerhouse Limberg III, is to be scanned. Most of the tunnel is shotcrete surface. The scan will serve as the basis to perform a clearance and transportation analysis to ensure that large components will fit through the tunnel.